DRDO's indigenous AIP system enters setting-to-work phase-2, to be handed to Navy in early 2027
The Defence Ministry said on 24 October 2026 that the setting-to-work phase-2 activity of DRDO's indigenous AIP system energy module was inaugurated. The system increases the underwater endurance of diesel-electric submarines.
What this means for you
This news does not directly affect the everyday life of ordinary people and no one needs to do anything about it. It is information about a defence technology developed in India for Indian Navy submarines.
Key facts
- The inauguration ceremony was held on 24 October 2026 at Larsen & Toubro's AM Naik Heavy Engineering Complex, Hazira, Gujarat.
- The AIP system has been indigenously developed by DRDO's Naval Materials Research Laboratory.
- In the next phase, the energy module will be activated for power generation and rigorously tested as per Indian Navy procedures.
- After testing, it will be handed over to Mazagon Dock Shipbuilders Limited in early 2027 for integration on a Kalvari-class submarine.
What has happened
According to the Defence Ministry, a significant milestone has been achieved in enhancing the Indian Navy’s underwater capabilities. DRDO’s Naval Materials Research Laboratory has indigenously developed the energy module of an Air Independent Propulsion (AIP) system. The setting-to-work phase-2 activity of this module was inaugurated.
What the AIP system does
The AIP system increases the underwater endurance of diesel-electric submarines. This is because it reduces their dependence on atmospheric oxygen.
Where and when the inauguration took place
The inauguration ceremony was held on 24 October 2026 at Larsen & Toubro’s AM Naik Heavy Engineering Complex, Hazira, Gujarat. Defence Secretary and Secretary of the Department of Defence Research and Development and DRDO Chairman Shri Rajesh Kumar Singh was the chief guest, who joined the ceremony virtually. Indian Navy’s Chief of Materiel Vice Admiral B Sivakumar and DRDO’s Director General (Naval Systems and Materials) Dr R Bala Murli Krishnan were present at the event at L&T Hazira.
What happens next
In the next phase, the AIP energy module will be activated for power generation and rigorously tested as per Indian Navy procedures. After that, it will be handed over to Mazagon Dock Shipbuilders Limited in early 2027 for integration on a Kalvari-class submarine.
What the official said
On the occasion, the DRDO Chairman congratulated DRDO and industry partners. He appreciated the scientific patience and industrial collaboration in the indigenous AIP programme, which he said has now turned into productive reality on the shop floor. He also acknowledged the Indian Navy’s support to DRDO, including testing and validation at every test stage of the programme. He stressed working on the next phases to meet the Navy’s induction timeline for the AIP system, while also underlining the importance of maintaining the necessary safety culture of the hydrogen and fuel cell system without any compromise.
What this means for ordinary people
This is a defence technology achievement and is not directly connected to the everyday life of ordinary people. No one needs to apply for anything or meet any date because of it.
Questions and answers
What is the AIP system?
AIP stands for Air Independent Propulsion, a system that increases the underwater endurance of diesel-electric submarines. It reduces the submarine's dependence on atmospheric oxygen.
Who developed this AIP system?
The system has been indigenously developed by DRDO's Naval Materials Research Laboratory.
What happens to the AIP energy module next?
In the next phase, it will be activated for power generation and rigorously tested as per Indian Navy procedures. After that, it will be handed over to Mazagon Dock Shipbuilders Limited in early 2027.
Do ordinary people need to do anything about this?
No, this is a defence technology milestone and ordinary people do not need to take any action.
Source: PIB, "भारतीय नौसेना के डीज़ल-इलेक्ट्रिक पनडुब्बियों के लिए स्वदेशी एआईपी प्रणाली ने ‘काम शुरू करना चरण-2’ (सेटिंग टू वर्क फ़ेज़-2) गतिविधि के उद्घाटन के साथ महत्वपूर्ण उपलब्धि हासिल की", 24 October 2026. Read the original notice
This routine notice was drafted with AI from an official source and published automatically; an editor reviews it after publishing. Report an error